Quote:
Originally posted by serotone9
that happened to me, too -- some sort of client core error, it said, and it dumped the whole thing in the 90% range. :mad:
i'm thinking about trying to write a script or linux cron job that will save all the work every hour. then if there's any program lock up or crash again, at least the most that would be lost would be an hour's worth of work. in windows, setting up an auto backup of the needed files to run every hour would probably do the trick.
the problem is, if a new work unit was downloaded and started (as it was for me), the new saves would overwrite the old WU. so i'd like to figure out how to get around that somehow -- will have to study cron or something -- because it really sucked to lose close to 10hrs. of work!
I wonder if I was to set a system restore if it would work that way too. So if I installed something and it interfered with the WU or if my computer froze up again, it would at lease save some of the work.